Work/LIFT

LIFT: Robot Orchestration Platform

LIFT is software that helps a factory's robots and computer systems work together, so materials keep moving without getting stuck. My job was the design: the screens and steps a factory worker uses to run the robots, watch the work, set up new tasks, and manage the floor.

ClientFlexware Innovation (Hitachi Group) · US
DomainIntralogistics · AGV/AMR
My roleProduct Designer
RecognitionMIRA Tech Innovation of the Year, 2026
Live linkVisit site
At a glance
01

Installation wizard

Guided first-time setup.

02

Workflow monitoring

Every running job on one screen.

03

Workflow builder

Build jobs without code.

04

Factory locations

A map of every spot on the floor.

05

Integrations

Connect the factory's systems.

06

Resource fleet overview

Every robot's health at a glance.

07

Simulation

Simulation runs and their results.

Workflow monitoringWorkflow builderFactory locationsIntegrationsResource fleet overviewSimulation

Installation wizard

The first screen a new site sees. The wizard walks the installer through setting up LIFT one step at a time, so nobody has to guess what comes next or where a setting lives.

01 / The business problem

A factory can buy the best robots and still see them stop and wait.

The problem usually isn't the robot. A modern factory runs on several systems at once: the robots that move materials, the software that plans the work, and the people on the floor who keep it all going. When those systems don't talk to each other well, a robot finishes its task and then waits for an instruction that hasn't arrived, and the work behind it piles up.

LIFT is the software in the middle that keeps the robots and the factory's other systems in sync in real time. The client set the rules for how it should work. My job was to turn those rules into screens a factory worker can use during a busy shift: set up a job, watch it run, and step in when something goes wrong.

On the floor

Robots stop and wait

Jobs get stuck between systems, and it is hard to tell which step a job is waiting on.

In the middle

LIFT keeps everything in sync

One platform connects the robots and the factory's systems, so a job can move from one step to the next.

On the screen

Where my design came in

Workers need to build jobs without code, see every running job at once, and fix a stuck one the moment they find it.

User journey

One floor,
four roles.

Each role meets LIFT at a different moment in a robot job's life. The map follows a job from setup to review and shows which part of the design helps at each step.

1

Set up the site

2

Build the jobs

3

Run the shift

4

Fix what breaks

5

Review performance

Who
Integration Engineer
Integration EngineerTechnician
Operator
TechnicianOperator
Plant Manager
What they do
Installs LIFT, connects the factory’s systems and maps its areas, stations and spots.
Turns the client’s rules into robot jobs, with branches for different situations.
Starts jobs and keeps an eye on them during production.
Finds the job that stopped and gets it moving again.
Checks how the robots and the floor are performing.
What gets in the way
Every plant is set up differently, and compatibility issues slow the integration down.
The rules are complex, and the people setting them up are not always programmers.
Many tasks at once, and a need for clear, simple instructions rather than technical detail.
Unexpected faults in the middle of a shift, on top of routine maintenance.
Needs data-backed numbers to cut downtime, not every detail of every job.
How the design helps
→ In the designInstallation wizard, Integrations with clear connection status, and the Factory locations map.
→ In the designWorkflow builder: drag blocks, a clear works and fails path, then check, save and send for approval.
→ In the designMonitoring screen: one card per job, with running and error counts at the top.
→ In the designFlow Viewer shows the step where a job stopped, with Pause, Stop and Retry close at hand.
→ In the designResource fleet overview and simulation results shown as charts and summary counts.
12345
1

Set up the site

Integration Engineer
What they do

Installs LIFT, connects the factory’s systems and maps its areas, stations and spots.

What gets in the way

Every plant is set up differently, and compatibility issues slow the integration down.

→ How the design helps

Installation wizard, Integrations with clear connection status, and the Factory locations map.

2

Build the jobs

Integration EngineerTechnician
What they do

Turns the client’s rules into robot jobs, with branches for different situations.

What gets in the way

The rules are complex, and the people setting them up are not always programmers.

→ How the design helps

Workflow builder: drag blocks, a clear works and fails path, then check, save and send for approval.

3

Run the shift

Operator
What they do

Starts jobs and keeps an eye on them during production.

What gets in the way

Many tasks at once, and a need for clear, simple instructions rather than technical detail.

→ How the design helps

Monitoring screen: one card per job, with running and error counts at the top.

4

Fix what breaks

TechnicianOperator
What they do

Finds the job that stopped and gets it moving again.

What gets in the way

Unexpected faults in the middle of a shift, on top of routine maintenance.

→ How the design helps

Flow Viewer shows the step where a job stopped, with Pause, Stop and Retry close at hand.

5

Review performance

Plant Manager
What they do

Checks how the robots and the floor are performing.

What gets in the way

Needs data-backed numbers to cut downtime, not every detail of every job.

→ How the design helps

Resource fleet overview and simulation results shown as charts and summary counts.

Swipe to follow the journey
02 / What I owned

From PRD
to shipped.

01

Requirements

Worked from customer requirements and the Product Manager's PRDs to understand exactly what each part of the platform needed to do.

02

User flows

Defined the flows that turn intended behaviour into a concrete path, including the points where a mission can fail and needs handling.

03

Prototypes

Built prototypes and mockups that made the flows tangible, so the logic could be judged before development.

04

R&D review

Checked the flows against what was technically feasible, and reworked them where engineering reality changed the approach.

05

Delivery

Worked closely with developers through build, keeping the intent behind each flow intact to the shipped output.

03 / Selected features

Three features,
end to end.

Each feature started as rules from the client and the Product Manager, and ended as screens a factory worker uses every shift.

Feature 01

The monitoring screen & job detail view

?The challenge

A factory can have hundreds of robot jobs running at the same time. The client needed one screen where a worker could watch all of them, notice problems quickly, and step into any single job without losing track of the rest.

What I designed
  1. 01A screen of small cards, one per robot job, showing status, duration and progress, with search and filters.
  2. 02A count at the top showing how many jobs are running and how many have errors.
  3. 03A Flow Viewer that shows a single job as connected steps, with a timeline you can slide back and forth.
  4. 04Pause, Stop and Retry controls, so a worker can fix a stuck job the moment they find it.
The monitoring screen & job detail view
The monitoring screen & job detail view
The monitoring screen & job detail view
Feature 02

Setting up a robot's job

?The challenge

The building blocks and rules were defined by the client. The requirement was to let someone who isn't a programmer snap these blocks together into a working job, add branches for different situations, and get it approved before switching it on.

What I designed
  1. 01A canvas where you drag blocks and connect them, reading left to right from a start block to an end block.
  2. 02A settings panel for each block, where you set what kicks the job off.
  3. 03A clear “if it works” and “if it fails” path on each block.
  4. 04Steps from draft to live: check for mistakes, save, and send for approval.
Setting up a robot's job
Setting up a robot's job
Setting up a robot's job
Feature 03

Mapping the factory floor

?The challenge

A robot can't be sent anywhere unless the software has a map of the space. The client defined the states a spot can be in (free, taken, reserved or switched off) and how the factory is organised into areas and stations.

What I designed
  1. 01A two-part screen: areas and stations on the left, the spots inside them on the right.
  2. 02Each spot shown as a small card with a colour and label for its state.
  3. 03Grid or list view, plus search, so even a large factory stays easy to manage.
  4. 04Adding and editing spots right on the same screen.
Mapping the factory floor
Mapping the factory floor
User flow

From rules
to a live job.

How an Integration Engineer turns the client's rules into a robot job in the Workflow builder, and how the job gets checked before it ever runs on the floor.

Flow for: Integration Engineer
StartStep on a screenDecisionDone

Open the Workflow builder

Start

Start a new job as a draft.

Workflow builder
1

Drag blocks onto the canvas

Connect them left to right, from a start block to an end block.

Canvas
2

Set up each block

Choose what kicks the job off in the block's settings panel.

Settings panel
3

Add the two paths

Give each block an “if it works” and an “if it fails” path.

Canvas

Any mistakes in the job?

Yes↺ loops back

Fix the flagged blocks and check again

Yes↺ loops back

Fix the flagged blocks and check again

No
4

Save and send for approval

The job waits for review before it can be switched on.

Approval

Approved?

No↺ loops back

Back to draft with comments

No↺ loops back

Back to draft with comments

Yes

The job goes live

Done

Workers can now see it running on the Monitoring screen.

Monitoring screen
MIRA Tech Innovation<br>of the Year, 2026
Recognition

MIRA Tech Innovation
of the Year, 2026

Awarded to LIFT by Flexware Innovation (Hitachi Group).

From robots waiting on systems to one platform that keeps the floor moving.

2026
MIRA Tech Innovation of the Year
00%
Less time to set up a new robot job
ClientFlexware Innovation (Hitachi Group)My role · Product Designer
References
  • Corey Peruffo · Products Technical Consultant
  • Jerrod Smith · Senior Software Engineer
flexware